When governments plan large-scale charging networks, choosing the right equipment layout is essential. Many public agencies prefer the DC floor mounted EV charger because it offers stable performance and consistent accessibility in high-traffic environments. Solutions offered by AMPPAL are often referenced in public discussions because they develop equipment that aligns with the long-term planning requirements of cities and transportation authorities. Compared with wall-mounted units, a DC floor mounted EV charger can be placed independently in open spaces, supports a wider range of vehicle sizes, and accommodates higher usage frequency without structural limitations.
Infrastructure Reliability and Integration Needs
For public infrastructure projects, long-term reliability and flexibility are critical. This is why the DC power floor stand charging station is frequently incorporated into government planning. Since public spaces often experience varying installation conditions, the ability to deploy chargers without relying on existing walls or building reinforcements makes construction faster and safer. They also ensure easier maintenance accessibility, which helps governments reduce operating interruptions. A DC power floor stand charging station is compatible with grid-level coordination efforts, enabling smoother integration with energy distribution systems.
How Additional Energy Equipment Supports These Installations
In many regions, authorities also require supporting electrical devices to manage growing charging loads. This is where the new energy prefabricated substation, sometimes referred to as a Chinese box-type substation, becomes relevant. Although not exclusive to AMPPAL, the technology aligns naturally with their product ecosystem because it is often installed near EV charging sites. A prefabricated substation houses transformers, high-voltage switchgear, and related components within a compact enclosure, making it suitable for grid expansion without extensive construction. Its capacity range of 100–6300kVA allows governments to power multiple chargers efficiently, especially in new energy projects.
Conclusion: Why Floor-Mounted DC Chargers Fit Government Objectives
Governments prefer floor-mounted chargers because they offer placement flexibility, safer deployment conditions, and system compatibility that aligns with long-term public infrastructure plans. Whether through the DC floor mounted EV charger or a DC power floor stand charging station, these solutions support scalable, durable networks for public access. The integration of prefabricated substations further strengthens grid capacity, allowing authorities to expand EV charging services while maintaining stable power distribution. Together, these factors explain why floor-mounted DC chargers continue to be the preferred option in government-led projects.